Custom injection mould cost: what the fee is made of, and how to structure amortisation
A mould quote is not one number. It is a structure of cavities, steel, finish, trials and lead time — and amortisation terms decide whether that structure helps you or traps you.
Reviewed by the Anbo United export team · Page last updated:
Tooling and cost · 2026-10-16
Direct answer
A custom mould quote is a build-up, not a fixed market price. It varies by cavity count, mould steel, surface finish, whether the tool includes a hot runner or multi-cavity tooling, how many trial shots are included, and how long you hold the tool before amortising it. A buyer comparing two mould quotes by the total figure is comparing two different tools.
We do not publish a mould price range on this site, and we would treat a quoted range with no build-up the same way. What we publish is the lead time the tool has to fit inside — 45–50 days for a regular production programme — and that tool lead time is a separate question from production lead time, which is where most schedule misunderstanding happens.
The published figures
What a mould quote is made of, and what to pin down in the terms
| Component | What drives it | What to pin down |
|---|---|---|
| Cavity count | Programme volume and expected life | Cavities quoted, and whether the price assumes a specific volume |
| Mould steel | Material moulded, cycle time, tool life expectation | The steel grade named in the quote |
| Surface finish and texture | Appearance requirement, cycle time | Settle on a physical sample, not a render |
| Trial shots | Defect iteration during tool bring-up | How many are included and whether re-shooting is charged |
| Tool lead time | Toolmaker capacity | Separate date from production lead time |
| Amortisation basis | Order value versus units | Per part or per programme; refund trigger stated explicitly |
| Tool ownership on exit | Programme end condition | What happens to the tool if the programme stops |
We publish a 45–50 day regular production lead time and tool and moulds as a service line. We do not publish a mould price range, because cavity count, steel, finish, trials and amortisation terms all move it.

The components a mould quote is actually made of
Cavity count. The single largest driver. A single-cavity tool for a 50,000-unit programme and a four-cavity tool for the same programme have different economics, and the four-cavity tool usually costs more up front while costing less per unit. If your volume is uncertain, this is the decision that changes first.
Mould steel. Varies with the material being moulded, the cycle time and the expected tool life. A hot runner and higher cycle times demand more from the steel, and it is the second largest driver after cavities.
Surface finish and texture. A texture that reads well on a sample may be expensive and long-cycle in production. Worth settling on a physical sample rather than a render.
Trial shots. How many are included, and whether re-shooting a cavity to correct a defect is charged. This is where mould cost surprises usually come from — not the tool, the iteration.
Tool lead time. Separate from production lead time, and it sits in front of it on the schedule.
How amortisation terms decide whether the tool helps or traps you
Amortisation is a commercial structure, not a calculation. The same mould fee is recoverable quickly under one structure and is a stranded asset under another. What to establish:
1. What the fee covers and what it excludes. Amortisation of a mould fee does not cover mould maintenance, re-shooting a worn cavity, or a change to the design that requires a new insert.
2. Whether it is refundable and against what. A refundable tooling fee is an incentive structure, and it should be stated in the same terms as the refund trigger — usually cumulative order value across the programme, not a single shipment.
3. Whether the fee is per part or per programme. Per part spreads it across units; per programme concentrates it at the start. They behave very differently at low volume.
4. What happens to the tool when the programme ends. This is the clause most often missing and the one that determines whether you can move a tool to a second supplier or a second product.
The revision question that determines whether the tool is still usable
A mould is specific to a geometry. If the design changes, the question is not whether you own the tool but whether the change can be made in the existing tool — a cavity insert, a slide modification — or needs a new tool entirely.
This is why design freeze timing matters commercially. Every month of design churn after tooling is a month of mould cost and schedule exposure with nothing to show for it. Suppliers who pressure for early tooling are usually protecting their schedule, not yours.
What we publish, and what we confirm per project
We publish tool and moulds as a service line, and we publish our production lead time as 45–50 days. We do not publish a mould price, a cavity recommendation or an amortisation table, because all three depend on the part, the volume, the material and the term structure.
For a defined project we can quote the mould build-up and propose an amortisation structure against the volume profile you actually have. That is a quotation conversation with a volume forecast attached.
What to do before asking for a mould quote
Fix the volume profile first, even approximately, because cavity count follows it. Then ask for the quote as a build-up, not a total. Then settle the amortisation structure and the exit clause in writing before the tool is cut, because both are difficult to change afterwards.
What we will do
For a defined part and volume profile, we can provide the mould build-up, state the tool lead time separately from the production lead time, and propose amortisation terms. We will not quote a price range from a catalogue, because there is no such thing for a tool.
Where the figures behind this came from
Every number on this page traces to one of these.
| Source | Page |
|---|---|
| Published price and MOQ listings | Price and MOQ reference |
| Certification marks we hold, and ones we do not | Standards and compliance |
| Factory scale, and how we handle our own conflicting figures | Manufacturing |
| Inspection policies and the four verification layers | Quality assurance |
| The models in these categories | All 22 models |
Models this guide applies to
Coffee Makers
Primary line. Parts-intensive, so the spares plan is designed with the product.
| Model | Product | Architecture | Link |
|---|---|---|---|
| CM150 | 150 ml Capsule Espresso Machine | Capsule, single serve | Open model page → |
| CM320 | 20 Bar Semi-Automatic Espresso Machine with Grinder | Semi-automatic, integrated grinder | Open model page → |
| CM420 | Bean-to-Cup Automatic Espresso Machine | Fully automatic, colour display | Open model page → |
| CM520 | Programmable Drip Coffee Maker with Thermal Carafe | Drip, scheduled brewing | Open model page → |
Grills & Baking
Primary line. Seasonal shape, pairs with pizza makers and air fryers.
| Model | Product | Architecture | Link |
|---|---|---|---|
| GR300 | 1800 W Contact Electric Grill | Contact grill, hinged plate | Open model page → |
| GR360 | Outdoor Electric Barbecue Grill | Open-grill, tilting deck, upright storage | Open model page → |
| WF150 | 150 Waffle Maker with Interchangeable Plates | Waffle and sandwich plates, interchangeable | Open model page → |
Pizza Makers
Primary line. Countertop heat appliance, pairs with the grill range in one programme.
| Model | Product | Architecture | Link |
|---|---|---|---|
| PZ260 | 260 mm Countertop Pizza Maker | Home, single deck | Open model page → |
| PZ380 | 380 mm Countertop Pizza Maker with Rotating Deck | Commercial-duty, rotating deck | Open model page → |
Other guides
- What 20 bar actually means on an espresso machine2026-10-10Every espresso listing on our storefront states a bar figure, and the number means less than buyers assume. Here is what it does and does not tell you, and which of the published figures to trust.
- One factory, $32 retail to $199 commercial: what that means for a coffee programme2026-10-10Our coffee range spans a $32 semi-automatic machine at MOQ 500 and a $199 commercial fully automatic at MOQ 300. Most suppliers occupy one end of that. Here is why serving both changes a programme.
- ETL and VDE on one grill listing: what a buyer should notice2026-10-10Our 4-slice contact grill listing names CE, CB and ETL directly and carries a detachable VDE plug. Both details change what you can do with the product after you order it.
- A pizza function is not a pizza maker: reading the price gap correctly2026-10-10Our pizza listings span $35 to $85.80 and they are three different products. Reading the price gap as a specification gap is the mistake that costs a buyer the wrong shelf.
- PFAS-Free appears on most of our air fryer listings. Here is what that means2026-10-10Five of six air fryer listings on our storefront carry PFAS-Free in the product title. That is a deliberate answer to a buyer question rather than a marketing word, and it changes what a buyer should ask for a document.
- Our own factory figures disagree with each other. Here is how we handle it2026-10-10Our corporate site says 30,000 m² and 90 senior engineers. Our Global Sources profile says 16,000 m² and 20. Both are ours. This is how we publish that, and why.
- How to tell if a Chinese coffee maker supplier is a factory or a trading company2026-10-16A supplier's own category listing tells you more than its company description does. Here are five checks that separate a factory from an intermediary, in the order that produces an answer fastest.
- Verifying an NRTL listing is real: UL, ETL and the databases that check them2026-10-16An ETL or UL mark on a listing title is not a listing you can verify. Here is how to find the certificate, what to read on it, and why a listing title is the weakest evidence of a listing.
- The spare parts clause: how to structure free-of-charge parts in a coffee machine contract2026-10-16Free spare parts are easy to agree verbally and expensive to dispute. What matters is not the percentage — it is the part number list, the years, the claim window and the freight term.
- Vibration pump lifetime: what to ask a supplier, and why the answer is usually a number they cannot prove2026-10-16Pump life claims are the least verifiable specification on a coffee machine. Here is what a test record should contain, why cycles alone do not mean lifespan, and the three documents that make the claim checkable.
- Food-contact material documents for espresso machines: what to request and what each one proves2026-10-16A food-contact declaration is not a test report, and the gap between them is where most importers get caught. Here is what each document type proves, which market asks for which, and what our own documents cover.
- California Proposition 65 and small kitchen appliances: when it does not apply, and when it does2026-10-16Prop 65 is a warning regime, not a certification. Here is how it actually attaches to a small appliance, why the brass boiler question applies to very few importers, and what to do when you are not sure which case you are in.
- What actually determines units per container: why the unit count is the last question, not the first2026-10-16Nobody can tell you how many units fit in a 40ft HQ without the carton dimensions. Here are the variables that actually move the number, and the three figures you need before any loading plan is worth reading.
- UL 1082 and coffee maker safety standards: scope, the other standards, and what to request2026-10-16One standard number does not cover a coffee machine range. Here is what a drip maker, an espresso machine and a commercial unit each sit under, and the four fields to check on whatever certificate a supplier hands you.
- ISTA 3A vs Amazon SIPP: what each drop test is for, and why the report matters more than the standard name2026-10-16Two drop tests answer two different questions about the same box. Here is which is which, what belongs in a report, and what a packaging supplier must confirm before a container is worth its freight.
- Tooling ownership in a manufacturing contract: the clauses that decide who owns the mould2026-10-16Tooling ownership is rarely about the clause text. It is about what happens when the relationship ends. Here are the fields that decide it, and why governing law belongs in a separate conversation.
- Tracing who actually manufactures a branded product: what you can verify, and what you cannot2026-10-16Questions about which factories make for which brands cannot be answered from public information — and anyone who gives you a confident answer is guessing. Here is what is verifiable, how to trace a supply chain within the law, and why guessing is a bad basis for a decision.
- How to Select a Coffee Machine Price Band for Saudi Tabby and Tamara?2026-10-22Saudi split-payment limits are not one number. Tabby's consumer finance licence reaches SAR 50,000, but the published terms at major Saudi retail partners cap financed baskets at SAR 9,000. A coffee machine above that ceiling needs a different route to market.
- How to Select a BIS-Certified Coffee Maker for India under IS 302?2026-10-22Electric coffee makers sold in India need BIS certification under IS 302 (Part 1):2024, and coffee makers carry a product-specific part on top. The 2026 Quality Control Order replaced the 2025 Order and applies to general enterprises from 1 October 2026.
- Which Coffee Machine Categories Should You Not Buy from Us?2026-10-22Anbo United makes seven household appliance categories and 22 models. We do not make Arabic coffee machines, dual-boiler commercial machines, multi-ingredient vending machines or South Indian filter coffee machines. Here is the boundary, and what to do instead.
Ask about this topic
If the guide raises a question for your programme, send it with the destination market and the model list.
At a glance
- Page subject
- Ningbo Anbo United Electric Appliance Co.,ltd (Anbo United)
- Location
- Ningbo, Zhejiang, China
- Primary product lines
- Coffee machines, pizza makers, electric grills
- Core category built alongside
- Air fryers — single basket, dual basket, oven type, smart
- Also manufactures
- Grills & baking, small home appliances, garment care, spare parts
- Services
- OEM / ODM manufacturing, private label, tool& moulds, compliance support
- Official links
- Alibaba.com · LinkedIn
- Sales contacts
- AMY (General Manager / CEO) ceo@anbolife.com · Tony (International Sales) tony@anbolife.com
- Contact
- +86-15355158390 · ceo@anbolife.com
- Content updated